For landlords in Redhill and across Surrey, installing an electric vehicle chargepoint can make a rental property more attractive, more practical and better prepared for the future. It may also be more affordable than expected thanks to the OZEV Electric Vehicle Chargepoint Grant for residential landlords.
From 1 April 2026, eligible landlords can claim 75% of the cost of buying and installing a chargepoint, up to £500 per socket. Grants are available for up to 200 sockets per year across a landlord’s properties, and the scheme is currently scheduled to remain open until 31 March 2027.
Whether you own a single rental house in Earlswood or manage multiple properties around Merstham, Nutfield or Salfords, this guide explains how the grant works, what landlords need to check and why professional EV charger installation in Surrey is essential.
What is the OZEV landlord EV charger grant?
The Office for Zero Emission Vehicles (OZEV) provides grants to help eligible residential landlords install electric vehicle chargepoints at rental properties.
The current grant offers:
| Grant feature | Details |
|---|---|
| Maximum funding | 75% of eligible costs, up to £500 per socket |
| Number of sockets | Up to 200 sockets per year across all eligible sites |
| Closing date | Currently scheduled for 31 March 2027 |
| Property type | Residential rental accommodation |
| Installer requirement | An OZEV-authorised installer must carry out the work |
| Equipment requirement | The chargepoint must meet the scheme’s eligibility requirements |
| Application timing | Approval must be received before installation starts |
The grant may apply to a single chargepoint at a rented house or several chargepoints serving a residential development. Landlords with properties in different parts of Surrey can potentially use the allowance across multiple sites, subject to the scheme rules.
There is also a separate grant of up to £500 for eligible renters and flat owners installing a home charging point. That is a different application route and should not be confused with the residential landlord grant.
Who can apply?
The residential landlord grant is intended for eligible organisations and landlords providing residential accommodation. This can include:
- Private landlords letting houses or flats
- Companies and partnerships owning residential rental properties
- Registered providers of social housing
- Local authorities with residential housing stock
- Property management companies applying on behalf of a landlord
- Property management, right-to-manage or resident management companies managing qualifying residential developments
The property must be residential rental accommodation in England, Wales, Scotland or Northern Ireland. The chargepoint must be installed at the rental property rather than at the landlord’s own home.
Landlords should also expect to provide information about the property, ownership or management arrangement and tenancy. Requirements can change, so it is important to check the current official landlord grant guidance before making plans.
Do not start work before grant approval
One of the most important rules is that installation work must not begin before OZEV has confirmed that the application is eligible.
This includes more than simply fitting the wallbox. You should avoid instructing work, starting cable routes or arranging associated installation activity until the application has been accepted through the current OZEV application platform.
The updated process introduced in 2026 means that landlords apply through the government’s online service. If the application is successful, the landlord and installer receive notification explaining the next steps. The installer then submits the claim and the approved grant is normally reflected in the final invoice or project cost.
A sensible order of events is:
- Check that the property and landlord arrangement appear to qualify.
- Choose an OZEV-authorised installer.
- Arrange a site survey and quotation.
- Submit the grant application.
- Wait for confirmation of eligibility.
- Only then allow installation work to begin.
- Keep the required paperwork and photographic evidence.
Starting too early could make the installation ineligible for funding.
Why install an EV charger at a Redhill rental property?
Attract more tenants
Electric vehicle ownership is increasing, and tenants may actively search for properties with private charging facilities. A dedicated chargepoint can be a useful differentiator when a tenant is comparing similar houses or flats.
This can be particularly valuable for properties with private driveways or designated parking, where a tenant can charge overnight without relying on public infrastructure.
Help future-proof the property
A chargepoint is a practical improvement that supports changing transport habits. It may be attractive to current tenants with an electric vehicle, but it can also make the property more appealing to future renters.
Adding charging infrastructure during other electrical work, refurbishment or a tenancy changeover may also reduce future disruption.
Support the property’s wider energy strategy
Installing an EV charger does not automatically improve a property’s EPC rating, and it does not by itself guarantee compliance with current or future regulations. However, it forms part of a wider move towards more efficient, lower-emission homes.
Landlords already considering insulation, heating upgrades, solar panels or electrical improvements may wish to plan EV charging at the same time. It is sensible to discuss the overall electrical design with a qualified electrician rather than treating the chargepoint as an isolated appliance.
Potentially improve rental appeal and value
A charger should not be viewed as a guaranteed way to increase rent or property value. However, it may increase the property’s appeal, reduce void periods or help it stand out in a competitive rental market.
The benefit will depend on location, parking availability, the type of tenant being targeted and the quality of the installation.

Electrical considerations for older Redhill properties
A professional survey is especially important across parts of Redhill and surrounding Surrey, where the housing stock includes older terraces, semis, conversions and properties with later extensions.
Areas such as Earlswood, Merstham, Nutfield and Salfords contain a mixture of housing styles and parking arrangements. Some properties may have straightforward driveway access, while others may involve shared parking, detached garages, long cable routes or limited off-street space.
An electrician will need to assess several issues.
Available electrical capacity
A typical EV charger can place a significant additional load on the property’s electrical installation. The existing supply, meter position, consumer unit and incoming cable must be considered.
If the property has electric heating, storage heaters, an immersion heater or other high-demand equipment, the installer may recommend load management. This can help prevent the total demand from exceeding safe limits by adjusting charging when other appliances are in use.
Consumer unit condition
Older fuse boards may not provide the protection required for a modern EV charging installation. A consumer unit upgrade may therefore be recommended, particularly where the existing board is outdated, damaged or lacks suitable protection.
The cost of this work may be separate from the grant allowance, so landlords should ask for a quotation that clearly distinguishes the chargepoint installation from additional electrical remedial work.
PEN fault protection and earthing
EV charging installations require appropriate protection against electrical faults, including risks associated with the protective neutral (PEN) conductor on certain supply arrangements.
The installer will determine the correct protection and earthing arrangements for the property. This is one reason why a qualified professional installation is important; a chargepoint should never be treated as a simple outdoor socket.
Cable routes and parking
The shortest cable route is not always the most suitable. The installer must consider wall construction, fire stopping, weather exposure, trip hazards and the position of the parking bay.
For flats or shared developments, landlord permission, resident management arrangements and cable routing across communal areas may also need to be addressed.
A practical step-by-step guide for landlords
1. Check the property and grant route
Confirm that the property is residential rental accommodation and that you are applying under the correct landlord scheme. If the property is occupied by a tenant who wants a charger for their own use, check whether the renter or flat-owner grant may be more appropriate.
Review the latest OZEV chargepoint grant information before committing to the project.
2. Find an authorised and qualified installer
For grant-funded work, use an OZEV-authorised installer and confirm that the proposed chargepoint model is eligible.
It is also sensible to choose a company with recognised electrical competence. ADS Electrical is an NICEIC Approved Contractor serving Redhill and surrounding Surrey areas. We can discuss the grant requirements, assess the property and help landlords understand any additional electrical work that may be needed.
3. Arrange a site survey
A site survey should cover:
- The incoming electrical supply
- Existing consumer unit and protective devices
- Earthing and PEN fault protection
- Proposed charger location
- Cable length and routing
- Driveway or parking arrangements
- Possible load-management requirements
- Any work needed to meet current electrical standards
For a block of flats or shared car park, the survey may also consider future expansion and how multiple chargepoints can be managed.
4. Apply and wait for confirmation
Once you have the quotation and property information, submit the application through the current OZEV platform. Do not allow installation to start until eligibility has been confirmed.
The scheme’s funding is limited and government guidance can change, so landlords should avoid assuming that an application is approved simply because the property appears to qualify.
5. Complete the installation and retain paperwork
Following approval, the installer can complete the work. You should receive relevant certificates, commissioning information and details of the installed chargepoint.
From April 2026, installers’ claims for landlord and renter installations also require photographic evidence, including images showing the chargepoint, model and serial number, parking space and wider installation location. Your installer should manage the evidence required for the claim.

What might the grant not cover?
The grant is capped at £500 per socket and covers up to 75% of eligible purchase and installation costs. The total cost may be higher where a property requires:
- A consumer unit replacement or upgrade
- Long or complicated cable routes
- Groundworks or trenching
- Repairs to an unsafe existing installation
- Additional protection or earthing work
- Load-management equipment
- Work in shared or managed parking areas
Ask for a detailed quotation so you understand the grant contribution and any remaining balance before work begins.
Plan scalable charging for flats and shared parking
Landlords managing a block of flats or several rental units should consider whether one chargepoint is enough. The grant allows up to 200 sockets per year, but the property’s supply and parking infrastructure may determine how many can be installed practically.
A staged installation may be more appropriate. Load management can help distribute available capacity between chargepoints, while planned cable routes and electrical infrastructure can make future additions easier.

Get professional advice on EV charger installation in Surrey
An EV charger can be a valuable improvement for a Redhill rental property, but the grant process and electrical requirements need to be handled in the right order. Check eligibility first, use an OZEV-authorised installer, obtain approval before work begins and budget for any consumer unit or supply upgrades that the survey identifies.
ADS Electrical provides EV charger installation in Surrey for landlords, homeowners and property managers. As a NICEIC Approved Contractor, we offer reliable electrical advice, free quotes within 24 hours and service across Redhill and surrounding Surrey areas.
For a site survey or quotation, contact ADS Electrical about EV charging solutions Redhill. We can help you plan a compliant installation, assess your property’s electrical capacity and coordinate the work from survey through to completion.